A164 Humber Bridge to Beverley Improvements

Client: East Riding of Yorkshire Council
Value: £10m

This project was one of 35 transport schemes approved by the government in a bid to boost the ailing economy. The scheme was designed to reduce congestion, particularly at peak periods, and improve traffic flows for up to 35,000 vehicles using the road each day.

Jackson installed a 1.5km section of dual carriageway, reconfigured four roundabouts and constructed lengths of new footpath/ cycleway.

The project was challenged by poor weather conditions throughout the Summer and Winter months but despite the bad weather, the job was delivered on time.